In March 2023, we were entrusted by a high-tech company to import a batch of piezoelectric crystal materials for sensor manufacturing from Russia. These products have three distinct characteristics: 1) They are precision electronic components; 2) They involve sensitive technology fields; 3) They have special requirements for transportation conditions. The client had previously attempted to import them independently but faced high port storage fees due to incomplete declaration elements and classification disputes.
Through preliminary research, we identified two common misconceptions in the HS classification of such products: first, they are often mistakenly classified under 8541 (diodes/transistors), when they should actually fall under 3824 (chemical-related industrial products); second, the key declaration element of the piezoelectric effect is often overlooked. This is precisely where the value of a professional agent lies—with 15 years of experience in importing electronic products, we avoided these beginner traps in advance.
Upon receiving the commission, our team immediately initiated a dual-track parallel working mode:
Here’s a practical tip: We requested the manufacturer to explicitly state in the test report that the material complies with IEC 60444 standard. This detail improved subsequent customs inspection efficiency by 40%.
After the goods arrived at Pudong Airport, we encountered a typical issue: Customs requested an explanation of the difference between the product and semiconductor materials. Thanks to the pre-prepared Technical Comparison Document (including electron microscope photos of the lattice structure and piezoelectric response curves), the technical verification process, which would normally take three days, was completed in just four hours.
Link | Conventional time consumption | Time Consumption for This Case | Optimization Measures |
---|---|---|---|
Document Review | 1 working day | 3 hours | Pre-entry system + electronic verification |
Classification confirmation | 2-3 working days | 0.5 working day | Prepared technical verification package in advance |
Inspection and release | 15-18 working days | 9 working days | AEO certification fast track |
Through this case, we identified new characteristics in the import of special electronic materials:
Many clients believe customs agents merely submit documents and run errands. In reality, we provided three key value-added services in this case:
It’s worth mentioning that our Electronic Product Import Knowledge Base has accumulated solutions for 237 similar cases, which is the core competency enabling us to handle emergencies quickly.
Based on the experience from this case, here are three recommendations for companies importing special electronic materials:
Finally sharing an industry statistic: professional agents average 2.7 days faster customs clearance than self-operated imports, while each days delay generates hidden costs (storage/breach/production losses) typically 3-5 times the visible fees. This is the economic logic behind more tech companies outsourcing import operations.
For the Electronic Materials Import Compliance White Paper or case-specific consultations, please contact our technical advisory team. Next issue will analyze import practices for Japanese semiconductor equipment - stay tuned.
? 2025. All Rights Reserved. Shanghai ICP No. 2023007705-2 PSB Record: Shanghai No.31011502009912